2.11.4.3 Scheme |
The maximum number that the Minor value can reach, after this value is reached the Major is
incremented by 1 and next time project is compiled the Minor is set to 0.
When the value is reached, the next time the project is compiled is set to 0. Put a 0 for
unlimited.
Revision random
maximum
The revision increments by random numbers that you decide, if you put here 1, the revision obviously will
increment by 1.
Build times before incrementing
Minor
After successful changes to code and compilation the build history will increment, and when
it reaches this value the Minor will increment.
2.11.4.2 Status
2.11.4.4 Settings
Created: 2010/25/05 11:52 Updated: 2010/25/05 11:52
Author: HighTec EDV-Systeme GmbH
Copyright © 2010 HighTec EDV-Systeme GmbH
Author: HighTec EDV-Systeme GmbH
Copyright © 2010 HighTec EDV-Systeme GmbH