2.1.3 Applying EPCs
Periodically, LANSA provides Expedited Program Changes (EPCs) to distribute minor updates and new features.
Each EPC will consist of a document, the updated software and usually a load routine. The EPC load routine may vary depending on the type of software objects to be installed by the EPC. The documentation will include instructions for the installation and removal of an EPC.
Read all documentation before installing an EPC.
Some EPCs require a prerequisite EPC to be loaded. When you are loading an EPC, the load process will check for the existence of previously required EPCs.
To see a list of EPCs already applied to Visual LANSA, use the Help menu in the LANSA Editor and select
option.